Analysis of Internal Factors Causing Delays in Jabodebek LRT Project


Authors : M. Alfons Kurniawan; Tjokro Hadi; Suwarto; Leily Fatmawati; Arief Subakti Ariyanto; Supriyadi

Volume/Issue : Volume 7 - 2022, Issue 8 - August

Google Scholar : https://bit.ly/3IIfn9N

Scribd : https://bit.ly/3TaCxMq

DOI : https://doi.org/10.5281/zenodo.7017899

Light Rail Transit (LRT) is a rail-based accommodation project that started in 2015. During the implementation process, this project faced internal problems which caused delays in the completion process. Therefore, the purpose of this study is to determine the internal factors that cause delays in related projects. The population of this research is the project field staff and the sample is taken using the saturated sample method where the entire population in this study is the sample. The analytical method used in this study is the Structural Equation Modeling (SEM) method. The results obtained from this study indicate that the internal factors causing the delay in the LRT project are Factor 1: Labor, Factor 2: Material, Factor 3: Equipment, Factor 4: Finance.

Keywords : Internal; Lateness; SEM; Project

CALL FOR PAPERS


Paper Submission Last Date
31 - March - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe