⚠ Official Notice: www.ijisrt.com is the official website of the International Journal of Innovative Science and Research Technology (IJISRT) Journal for research paper submission and publication. Please beware of fake or duplicate websites using the IJISRT name.



Analysis of the Critical Path Methods Impacts on the Basic T-Shirt Manufacturing Process in the Apparel Industries


Authors : S M Masum Alam

Volume/Issue : Volume 7 - 2022, Issue 9 - September


Google Scholar : https://bit.ly/3IIfn9N

Scribd : https://bit.ly/3xUwum4

DOI : https://doi.org/10.5281/zenodo.7117844


Abstract : Time and motion studies' effects on the apparel and textile industries increase their profitability and help to define the standard minute value (SMV), which is then used to clear traffic jams, reduce downtime, and increase production. The main goals of this research are the determination of the procedures which are appropriate for the garment production process. The second aim is to demonstrate the benefits and drawbacks of employing those tactics for the factory. The final option is to illustrate how the PERT and CPM affect the competitiveness of the entire garment sector. The Line balancing with CPM and PERT resulted in this work reduced the manpower from 17 to 11, an increase in line efficiency from 49 to 77.5 percent, and a reduction in production costs from 75 to 46 BDT for a basic T-shirt manufacturing process.

Keywords : Critical Path Method (CPM), PERT, Textile Apparels, Industries, Manufacturing.

Time and motion studies' effects on the apparel and textile industries increase their profitability and help to define the standard minute value (SMV), which is then used to clear traffic jams, reduce downtime, and increase production. The main goals of this research are the determination of the procedures which are appropriate for the garment production process. The second aim is to demonstrate the benefits and drawbacks of employing those tactics for the factory. The final option is to illustrate how the PERT and CPM affect the competitiveness of the entire garment sector. The Line balancing with CPM and PERT resulted in this work reduced the manpower from 17 to 11, an increase in line efficiency from 49 to 77.5 percent, and a reduction in production costs from 75 to 46 BDT for a basic T-shirt manufacturing process.

Keywords : Critical Path Method (CPM), PERT, Textile Apparels, Industries, Manufacturing.

Paper Submission Last Date
31 - October - 2026

SUBMIT YOUR PAPER CALL FOR PAPERS
Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe