Abstract :
The purpose of the study was to determine the
impact of external environmental elements, material
considerations, project specifications, and team
capabilities on the project performance of PT Adyawinsa
Telecommunications & Electrical. The method of
analysis employing regression analysis with SPSS
statistical software. Adjusted R Square (R2) is calculated
to be 0.772% based on the findings of the regression
analysis. 77.2 percent of the variance in the dependent
variable firm performance may be explained by internal
environmental factors (X1), material factors (X2),
project requirements (X3), and team capabilities (X4),
whereas 22.8 percent is influenced by variables outside
the scope of this study. Calculated F value = 51,655> F
table = 2,534 with Sig. F 0.000 < = 0.05, meaning that the
internal environmental factors, project specification
material factors and team capabilities (X5)
simultaneously have an effect on project performance
(Y). The results of the t-test indicate that there are 3
independent (free) variables that significantly affect the
dependent variable with an error rate of less than 5%.
These variables are external environmental factor
variables (Sig: 0.015), material factor variables (Sig:
0.000) and project specification variables (Sig: 0.000),
while the team capability variable does not significantly
affect project performance.
Keywords :
External Environment, Materials, Project Specifications, Team Capabilities, Performance, Regression Analysis.
The purpose of the study was to determine the
impact of external environmental elements, material
considerations, project specifications, and team
capabilities on the project performance of PT Adyawinsa
Telecommunications & Electrical. The method of
analysis employing regression analysis with SPSS
statistical software. Adjusted R Square (R2) is calculated
to be 0.772% based on the findings of the regression
analysis. 77.2 percent of the variance in the dependent
variable firm performance may be explained by internal
environmental factors (X1), material factors (X2),
project requirements (X3), and team capabilities (X4),
whereas 22.8 percent is influenced by variables outside
the scope of this study. Calculated F value = 51,655> F
table = 2,534 with Sig. F 0.000 < = 0.05, meaning that the
internal environmental factors, project specification
material factors and team capabilities (X5)
simultaneously have an effect on project performance
(Y). The results of the t-test indicate that there are 3
independent (free) variables that significantly affect the
dependent variable with an error rate of less than 5%.
These variables are external environmental factor
variables (Sig: 0.015), material factor variables (Sig:
0.000) and project specification variables (Sig: 0.000),
while the team capability variable does not significantly
affect project performance.
Keywords :
External Environment, Materials, Project Specifications, Team Capabilities, Performance, Regression Analysis.