Analysis of Worker Productivity Based on Work Wage Costs in Laboratory Construction Dinas Pekerjaan Umum Nagan Raya


Authors : Edi Mawardi; Mohd Sofiyan Sulaiman; T. M. Azis Pandria

Volume/Issue : Volume 8 - 2023, Issue 11 - November

Google Scholar : https://tinyurl.com/4jj8zfmr

Scribd : https://tinyurl.com/4uu4j4an

DOI : https://doi.org/10.5281/zenodo.10279570

Abstract : One of the most important factors in a construction project is labor wages. To find out labor wages, a measurement of labor productivity is needed which will later help contractors in improving project planning, which is one of the steps in getting a cost budget. Productivity can be used as a parameter in determining activity duration, number of workers, and costs. The main problem is analyzing or measuring the value of productivity/hours/people for each type of work in determining wages. The target of construction cost analysis using SNI 2007 is recalculated into SNI 2008. Based on the results of research on the Laboratory building construction project Dinas PU Nagan Raya The results obtained for bricklaying work according to the 2007 SNI planner's wages were not more efficient when compared to the 2008 SNI contract with details of the 2007 SNI work unit price of Rp. 18,000,-/person/m2 and according to SNI 2008 it is Rp. 15,000,-/person/m2, while from the results of work productivity in the field Rp. 21,085,- /person/m2. If for brick wall plastering work, the wage calculation according to the 2007 SNI planner is IDR. 7,000/person/m2 is not more efficient when compared to the 2008 SNI piece rate of Rp. 16,000,- /person/m2, while productivity in the field is Rp. 11,820,- /person/m2. For painting work according to the 2007 SNI planner Rp. 3,500,- /person/m2, not more efficient compared to the 2008 SNI wholesale rate of Rp. 3,000,- /person/m2, from productivity results in the field Rp. 11,975,- /person/m2.

Keywords : Worker Productivity; Brick; Wages; Dinas PU; Nagan Raya.

One of the most important factors in a construction project is labor wages. To find out labor wages, a measurement of labor productivity is needed which will later help contractors in improving project planning, which is one of the steps in getting a cost budget. Productivity can be used as a parameter in determining activity duration, number of workers, and costs. The main problem is analyzing or measuring the value of productivity/hours/people for each type of work in determining wages. The target of construction cost analysis using SNI 2007 is recalculated into SNI 2008. Based on the results of research on the Laboratory building construction project Dinas PU Nagan Raya The results obtained for bricklaying work according to the 2007 SNI planner's wages were not more efficient when compared to the 2008 SNI contract with details of the 2007 SNI work unit price of Rp. 18,000,-/person/m2 and according to SNI 2008 it is Rp. 15,000,-/person/m2, while from the results of work productivity in the field Rp. 21,085,- /person/m2. If for brick wall plastering work, the wage calculation according to the 2007 SNI planner is IDR. 7,000/person/m2 is not more efficient when compared to the 2008 SNI piece rate of Rp. 16,000,- /person/m2, while productivity in the field is Rp. 11,820,- /person/m2. For painting work according to the 2007 SNI planner Rp. 3,500,- /person/m2, not more efficient compared to the 2008 SNI wholesale rate of Rp. 3,000,- /person/m2, from productivity results in the field Rp. 11,975,- /person/m2.

Keywords : Worker Productivity; Brick; Wages; Dinas PU; Nagan Raya.

CALL FOR PAPERS


Paper Submission Last Date
31 - May - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe