Application of Fuzzy AHP Multi Criteria Decision to Determine Factor of Indonesian Shipyard’s Subcontractor Selection


Authors : Idris Hibatullah Abrar Kharismarsono; Arfan Bakhtiar; Purnawan Adi Wicaksono

Volume/Issue : Volume 8 - 2023, Issue 12 - December

Google Scholar : http://tinyurl.com/rpwfny28

Scribd : http://tinyurl.com/w85247d4

DOI : https://doi.org/10.5281/zenodo.10409668

Abstract : The role of shipyards in Indonesia is very important to maintain the continuity and security of ships operating, especially in Indonesian and foreign waters. Several aspects that need to be considered in the ship repair work process, one of which is the selection of subcontractors who are appropriate, qualified and in accordance with project needs and regulations. This is very crucial to ensure that the ship can operate well after the repair process. The role of subcontractors in shipyard projects is very important to support project success. In this research, 9 criteria have been determined that influence the selection of subcontractors in the shipyard business sector in Indonesia. The 9 criteria are Cost, Quality, Safety, Insurance repair and warranty, Delivery Time, Experiences of Company, Past Performance, Cooperation Ability, Resources. The results in this research were calculated using the Fuzzy AHP method and obtained the weight of the most influential criteria in selecting the most appropriate subcontractor for the shipbuilding business sector. So it is hoped that in the future the shipyard can optimize project performance with the right selected subcontractors.

Keywords : Subcontractor Selection; Shipyard; Fuzzy AHP.

The role of shipyards in Indonesia is very important to maintain the continuity and security of ships operating, especially in Indonesian and foreign waters. Several aspects that need to be considered in the ship repair work process, one of which is the selection of subcontractors who are appropriate, qualified and in accordance with project needs and regulations. This is very crucial to ensure that the ship can operate well after the repair process. The role of subcontractors in shipyard projects is very important to support project success. In this research, 9 criteria have been determined that influence the selection of subcontractors in the shipyard business sector in Indonesia. The 9 criteria are Cost, Quality, Safety, Insurance repair and warranty, Delivery Time, Experiences of Company, Past Performance, Cooperation Ability, Resources. The results in this research were calculated using the Fuzzy AHP method and obtained the weight of the most influential criteria in selecting the most appropriate subcontractor for the shipbuilding business sector. So it is hoped that in the future the shipyard can optimize project performance with the right selected subcontractors.

Keywords : Subcontractor Selection; Shipyard; Fuzzy AHP.

CALL FOR PAPERS


Paper Submission Last Date
31 - May - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe