Authors :
Vineeth Kumar K.; Nithin M. Patel; Abhishek P.; Vishwas J. S.
Volume/Issue :
Volume 9 - 2024, Issue 4 - April
Google Scholar :
https://tinyurl.com/3b9hwejs
Scribd :
https://tinyurl.com/z8zsnezy
DOI :
https://doi.org/10.38124/ijisrt/IJISRT24APR1147
Abstract :
Through this project report intend to bring
about an economical analysis of BengaluruMysuru
Expressway (NH-275) which is a stretch of 117km,
constructed under Bharatmala Pariyojana (BMP) phase
-1. For this economical analysis of Traffic
Characteristics various study were performed. Using the
studied data various estimations like liner regression
method were performed for Traffic forecast (future
Traffic), by traffic volume count data Average Daily
Traffic (ADT) and Annual Average Daily Traffic
(AADT) were considered. Estimation of Value of Time
(VOT) by empirical method and evaluation of Vehicle
Operating Cost (VOC) by Portuguese Road User Cost
(RUC) model were used to Comparing of Toll price with
VOT (Value of Time) and VOC (Vehicle Operating
Cost). Revenue and Expenses from toll plaza were
calculated and arrived that the company would gain
profit. For the estimation of Traffic forecasting we had
to study liner regression method. All the calculation
made are approximate and not exact.
Keywords :
Value of Time (VOT), Vehicle Operating Cost (VOC), Average Daily Traffic (ADT), Annual Average Daily Traffic (AADT).
Through this project report intend to bring
about an economical analysis of BengaluruMysuru
Expressway (NH-275) which is a stretch of 117km,
constructed under Bharatmala Pariyojana (BMP) phase
-1. For this economical analysis of Traffic
Characteristics various study were performed. Using the
studied data various estimations like liner regression
method were performed for Traffic forecast (future
Traffic), by traffic volume count data Average Daily
Traffic (ADT) and Annual Average Daily Traffic
(AADT) were considered. Estimation of Value of Time
(VOT) by empirical method and evaluation of Vehicle
Operating Cost (VOC) by Portuguese Road User Cost
(RUC) model were used to Comparing of Toll price with
VOT (Value of Time) and VOC (Vehicle Operating
Cost). Revenue and Expenses from toll plaza were
calculated and arrived that the company would gain
profit. For the estimation of Traffic forecasting we had
to study liner regression method. All the calculation
made are approximate and not exact.
Keywords :
Value of Time (VOT), Vehicle Operating Cost (VOC), Average Daily Traffic (ADT), Annual Average Daily Traffic (AADT).