Implementation of Total Productive Maintenance(TPM) to Enhance Overall Equipment Efficiency in Jute Industry – a Case Study


Authors : M.S.Rahman, M.A.Islam, M.N.I.Rabby.

Volume/Issue : Volume 3 - 2018, Issue 4 - April

Google Scholar : https://goo.gl/DF9R4u

Scribd : https://goo.gl/24f5Gy

Thomson Reuters ResearcherID : https://goo.gl/3bkzwv

The performance of equipment of industry depends on proper maintenance. Total Productive Maintenance (TPM) is a process which involves to maximize the performance of equipment thorough its full lifetime. It creates a dynamic environment where improvement efforts in safety, quality, cost, delivery and creativity are heartened with the participation of all employees. The purpose of the study is to improve the Overall Equipment Effectiveness (OEE) in jute mill by implementing Total Productive Maintenance (TPM) and also focuses on results oriented implementation methodology designed to minimize the big major equipment losses. For this research work, a case study has been taken in the Platinum Jubilee Jute Mill which is situated in Khulna, Bangladesh to evaluate the contribution of TPM initiatives to improve the manufacturing performance of equipment’s. After proper implementation of TPM in selected factory the Overall Equipment Effectiveness (OEE) improved 23.42%.

Keywords : TPM; OEE; Big Losses, case study.

CALL FOR PAPERS


Paper Submission Last Date
30 - April - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe