Abstract :
In the world of construction services, labor
productivity is one of the determining factors for the
success of a development project. Every worker in all
construction sectors must own high work productivity.
The high and low work productivity of the workforce
greatly affects the implementation time of the construction
project. Efforts should made to increasing labor
productivity by tightening supervision and paying
attention to the composition of each working group so that
they can work optimally. This study analyzes the
productivity of workers in reinforced concrete structure
work, which is devoted to ironwork and formwork
installation, by calculating the productivity of various
compositions of working groups, and comparing the
productivity results of these working groups. The method
used to compare working groups is the observation method
(direct observation), evaluating behavior for a continuous
period time, without intervening in the observed
environment.
Keywords :
Productivity; Labor; Construction Projects; Working Group.
In the world of construction services, labor
productivity is one of the determining factors for the
success of a development project. Every worker in all
construction sectors must own high work productivity.
The high and low work productivity of the workforce
greatly affects the implementation time of the construction
project. Efforts should made to increasing labor
productivity by tightening supervision and paying
attention to the composition of each working group so that
they can work optimally. This study analyzes the
productivity of workers in reinforced concrete structure
work, which is devoted to ironwork and formwork
installation, by calculating the productivity of various
compositions of working groups, and comparing the
productivity results of these working groups. The method
used to compare working groups is the observation method
(direct observation), evaluating behavior for a continuous
period time, without intervening in the observed
environment.
Keywords :
Productivity; Labor; Construction Projects; Working Group.