Abstract :
PT. GFRP is an engineering and
manufacturing company of FRP (Fiber Reinforced
Plastic) that produces various types of fiberglass
production with resin mixtures. Most work accidents on
FRP pipe installation work are caused by human error
because the process mostly requires human labor. This
study aims to analyze the probability of human error in
the FRP pipe installation process using the Standardized
Plant Analysis Risk Human Reliability Assessment and
Fault Tree Analysis methods. Based on the results of the
study using the SPAR-H method, the highest HEP values
Keywords :
Fault Tree Analysis (FTA), Fiberglass, Human error, Pipe connection, Standardized Plant Analysis Risk Human Reliability Assessment (SPAR-H)
PT. GFRP is an engineering and
manufacturing company of FRP (Fiber Reinforced
Plastic) that produces various types of fiberglass
production with resin mixtures. Most work accidents on
FRP pipe installation work are caused by human error
because the process mostly requires human labor. This
study aims to analyze the probability of human error in
the FRP pipe installation process using the Standardized
Plant Analysis Risk Human Reliability Assessment and
Fault Tree Analysis methods. Based on the results of the
study using the SPAR-H method, the highest HEP values
Keywords :
Fault Tree Analysis (FTA), Fiberglass, Human error, Pipe connection, Standardized Plant Analysis Risk Human Reliability Assessment (SPAR-H)