Authors :
Merce Masriani Zalukhu; Novalisae; Ferdinandus; Hepryandi Luwyk Djanas Usup; Yustinus Hendra Wiryanto
Volume/Issue :
Volume 10 - 2025, Issue 8 - August
Google Scholar :
https://tinyurl.com/bddebmys
Scribd :
https://tinyurl.com/5cbcfb2m
DOI :
https://doi.org/10.38124/ijisrt/25aug756
Note : A published paper may take 4-5 working days from the publication date to appear in PlumX Metrics, Semantic Scholar, and ResearchGate.
Note : Google Scholar may take 30 to 40 days to display the article.
Abstract :
This study aims to calculate coal volume in the Run of Mine (ROM) area at PT Victor Dua Tiga Mega using
Geodetic GPS and the cut and fill method. Geodetic GPS measurements produced 2,016 elevation points, which were
processed into contours with a 1-meter interval and a Digital Elevation Model (DEM). Volume calculation was performed
by comparing the initial and final surface models to determine elevation differences (ΔZ) across the stockpiles. The total
calculated volume was 170,915.146 m3, which was converted to tonnage using a coal density of 0.96 ton/m3, resulting in
164,078.540 tons. Compared to the weighing data of 160,766.433 tons, the deviation was 2%, within ASTM’s 2.78%
tolerance. The results indicate that Geodetic GPS provides accurate, efficient, and reliable measurements for coal volume
estimation, offering significant time and cost savings while maintaining high precision for large-scale mining operations.
Keywords :
Coal, Deviation, Geodetic GPS, Cut and Fill.
References :
- ASTM. (2023). Standard Practice for Tonnage Calculation of Coal in a Stockpile1.www.astm.org
- Karsznia, K., Osada, E., & Muszyński, Z. (2023). Real-Time Adjustment And Spatial Data Integration Algorithms Combining Total Station And Gnss Surveys With An Earth Gravity Model. Applied Sciences. Https://Www.Mdpi.Com/2076-3417/13/16/9380
- Khomsin, Pratomo Danar Guruh, Anjasmara Ira Mutiara, & Ahmad Faizzuddin. (2019). Analysis Of The Volume Comparation Of 3’s (Ts, Gnss And Tls). E3s Web Conf., 94, 1014. Https://Doi.Org/10.1051/E3sconf/20199401014
- Kiptiah, M., Sulistyo, T., Achmad, K., Fatmawati, & Kartika, D. M. R. (2022). Pendampingan Dan Pelatihan Pengajaran Geomatika Menggunakan Perangkat Simusurveyx Dan Stake Out Guide Di Program Keahlian Geospasial Dan Geologi Pertambangan Smkn 1 Balikpapan. 4(2), 320–326
- Kristianie, Y., Usup, H. L. D., & Ferdinandus (2023). Perhitungan Volume Timbunan Batubara Menggunakan Unmanned Aerial Vehicle (Uav) Di Pt. Mitra Barito Lumbung Energi Site Pt …. Proceedings Of …. Https://Www.Journal.Ubb.Ac.Id/Snppm/Article/View/4834
- Maiyudi, R., Ananda, F., Anaperta, Y. M., & Melbaral, A. (2023). Comparison Of Cut And Fill Volume Using Photogrammetric Measurement And Total Station Measurement. Geoscience And Remote Sensing Technology, 1(2), 1–3. Https://Doi.Org/10.57265/Georest.V1i2.7
- Priyadinata, R., & Siregar, C. A. (2022). Perbandingan Analisis Perhitungan Cut And Fill Menggunakan Data Topografi Yang Dilakukan Dengan Pengukuran Manual Dan Digital. Sistem Infrastruktur Teknik Sipil (Simteks), 2(Simteks), 215–228. Https://Doi.Org/Https://Doi.Org/10.32897/Simteks.V2i2.1239
- Okdiriyanto, M. A. (2024). Perhitungan Volume Stockpile Batubara Menggunakan Metode Fotogrametri Dan Metode Rtk (Geodetic Real-Time Kinematic ) Di Pt Triaryani …. Repository.Unja.Ac.Id. Https://Repository.Unja.Ac.Id/70844/
- Restika, A. P., Nirwana, H., & Asriyadi, A. (2021, October). Implementasi augmented reality sebagai media pembelajaran untuk pengenalan komponen total station. In Seminar Nasional Teknik Elektro dan Informatika (SNTEI) (pp. 208-214).
- Sepriadi, S., Adiwarman, M., Perdana, R., & Putra, P. (2023). Analisis Perbandingan Volume Overburden Berdasarkan Data Survey Menggunakan Software Surpac 6.5. 1 Dengan Data Truck Count Pada Pit Pandu Pt Putra Muba Coal. Jurnal Ilmiah Teknik Dan Sains, 1(2), 100–105.
- Zuhirmanto, Irvani, & Mardiah. (2018). Perhitungan Sumberdaya Batu Granit Pada Quarry PT Mandiri Karya Makmur Dengan Metode Cross Section Dan Metode Cut And Fill. Mineral, 3(1), 83–102. Https://Doi.Org/Https://Doi.Org/10.33019/Mineral.V3i1.158
This study aims to calculate coal volume in the Run of Mine (ROM) area at PT Victor Dua Tiga Mega using
Geodetic GPS and the cut and fill method. Geodetic GPS measurements produced 2,016 elevation points, which were
processed into contours with a 1-meter interval and a Digital Elevation Model (DEM). Volume calculation was performed
by comparing the initial and final surface models to determine elevation differences (ΔZ) across the stockpiles. The total
calculated volume was 170,915.146 m3, which was converted to tonnage using a coal density of 0.96 ton/m3, resulting in
164,078.540 tons. Compared to the weighing data of 160,766.433 tons, the deviation was 2%, within ASTM’s 2.78%
tolerance. The results indicate that Geodetic GPS provides accurate, efficient, and reliable measurements for coal volume
estimation, offering significant time and cost savings while maintaining high precision for large-scale mining operations.
Keywords :
Coal, Deviation, Geodetic GPS, Cut and Fill.