Risk Analysis in the Procurement Process of Goods and Services for Steam Power Plant Overhaul


Authors : Rangga Damar Bagaskara; Novandra Rhezza Pratama

Volume/Issue : Volume 9 - 2024, Issue 1 - January

Google Scholar : http://tinyurl.com/fwvhh9af

Scribd : http://tinyurl.com/2ej89apt

DOI : https://doi.org/10.5281/zenodo.10499904

Abstract : Power plant overhaul activities aim to maintain the reliability of power plants. All parties involved in this overhaul activity must be able to work dynamically to support the achievement of overhaul performance that is on time, on cost, on quality, on scope, on clean, and on safety (6 ON). Therefore, risk analysis and mitigation are needed in the process of procurement of goods and services for power plant overhaul so that it can assist companies in making decisions. Multi-Criteria Decision-Making (MCDM) method, especially the Analytic Network Process (ANP) method to obtain the weight of risk agents that affect the occurrence of a risk (risk event). House of Risk (HOR) method for risk identification, analysis and mitigation. The results of this study show that there are 12 types of risks with 18 risks caused by 20 risk causes.

Keywords : Analytic Network Process (ANP); House of Risk (HOR); Risk Management; Overhaul.

Power plant overhaul activities aim to maintain the reliability of power plants. All parties involved in this overhaul activity must be able to work dynamically to support the achievement of overhaul performance that is on time, on cost, on quality, on scope, on clean, and on safety (6 ON). Therefore, risk analysis and mitigation are needed in the process of procurement of goods and services for power plant overhaul so that it can assist companies in making decisions. Multi-Criteria Decision-Making (MCDM) method, especially the Analytic Network Process (ANP) method to obtain the weight of risk agents that affect the occurrence of a risk (risk event). House of Risk (HOR) method for risk identification, analysis and mitigation. The results of this study show that there are 12 types of risks with 18 risks caused by 20 risk causes.

Keywords : Analytic Network Process (ANP); House of Risk (HOR); Risk Management; Overhaul.

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe