Construction projects in Rwanda, including dry construction and green building initiatives, continue to face schedule delays, cost pressures, and sustainability challenges. This study examined the influence of planning performance, measurement performance, and uncertainty management on project performance at Kibagabaga Residential Gezana Apartment in Kigali City. A quantitative, descriptive and explanatory research design was adopted. Data were collected through a structured five-point Likert-scale questionnaire from 70 project managers, engineers, quantity surveyors and contractors, with all 70 responses valid. Data were analysed using descriptive statistics, Cronbach’s Alpha, Pearson correlation, one-way ANOVA and regression analysis in SPSS.
Keywords :
Project Management Practices; Planning Performance; Measurement Performance; Uncertainty Management; Project Performance; Dry Construction; Green Building; Rwanda.
References :
- Akinsulire, U., Adetola, N. A., Idemudia, M., Courage, V., Okwandu, I., Azubuike, S., et al. (2024). Strategic planning and investment analysis for affordable housing: Enhancing viability and growth. Magna Scientia Advanced Research and Reviews, 11(2), 119–131.
- Almusaed, H., Amjad, T., Yitmen, J., Ibrahim, A., Myhren, C., Jonn, A., et al. (2024). Assessing the impact of recycled building materials on environmental sustainability and energy efficiency: A comprehensive framework for reducing greenhouse gas emissions. Buildings, 14(6), 1566.
- Cyubahiro, A., Félicien, K., Dushimimana, J. d., & Jean, H. (2025). Effect of project planning on performance of social protection project: A case of Kirawigire Project in Gakenke District, Rwanda. African Quarterly Social Science Review, 2(1), 229–238.
- Ibrahim, Z., Abdelazim, R., Zayed, A., Tarek, E., Lafhaj, K., Lafhaj, P., & Zoubeir, M. (2024). Enhancing construction performance: A critical review of performance measurement practices at the project level. Buildings, 14(7), 1988.
- Ntawuhongerumwanzi, C., Cyprien, T., Richard, M., MIND'JE, H., Twagirimana, F., Dieudonne, I., et al. (2025). Contribution of green technologies on infrastructure performance in Rwanda, a case of green buildings constructed in the Green Gicumbi Project. International Journal of Environment, Agriculture and Biotechnology, 10(2), 609299.
- Rugambwa, A., Emile, B., Gwaya, O., Abednego, O., Wanyona, H., & Githae, U. (2025). Assessment of project management maturity in the construction industry of Rwanda. Africa Habitat Review, 20(2), 3396–3408.
- Rukundo, J., Rogers, N., Kamande, G., & Mercyline, T. (2022). Monitoring and evaluation and construction project performance in Rwanda: A case study of Musanze and Rwamagana Road Project. Journal of Entrepreneurship & Project Management, 6(5), 21–31.
- SLAEAT, Z., & FATIMAH, H. (2024). The impact of poor planning on the duration and cost of the projects: The implications of poor planning on the projects. Mesopotamian Journal of Civil Engineering, 2024, 60–81.
- Toochukwu, I., & Abugu, G. C. (2025). Sustainable construction practices: Balancing cost efficiency, environmental impact, and stakeholder collaboration. International Research Journal of Modernization in Engineering Technology and Science, 7(1), 4118–4140.
- Yang, M., Lin, F., Lou, Q., Wang, J., Zhao, X., & Xianbo, K. (2021). Risk response of complex projects: Risk association network method. Journal of Management in Engineering, 37(4), 05021004.
Construction projects in Rwanda, including dry construction and green building initiatives, continue to face schedule delays, cost pressures, and sustainability challenges. This study examined the influence of planning performance, measurement performance, and uncertainty management on project performance at Kibagabaga Residential Gezana Apartment in Kigali City. A quantitative, descriptive and explanatory research design was adopted. Data were collected through a structured five-point Likert-scale questionnaire from 70 project managers, engineers, quantity surveyors and contractors, with all 70 responses valid. Data were analysed using descriptive statistics, Cronbach’s Alpha, Pearson correlation, one-way ANOVA and regression analysis in SPSS.